Coattech 3M Heavy-Duty Water Curtain Spray Booth Built for Global Industrial Standards

Podstawowe informacje
Miejsce pochodzenia: Chiny
Nazwa handlowa: Aerocure
Orzecznictwo: CE
Numer modelu: Coattech 3M-WCSB-201/304
Minimalne zamówienie: 1
Cena: USD2000-USD5000/SET
Szczegóły pakowania: Z zwykłym filmem i kartonem
Czas dostawy: 15 dni po wpłaty
Zasady płatności: T/T
Możliwość Supply: 30 zestawów/miesiąc
Zasilacz:: 380 V/50 Hz/3ph lub inna opcja Korzystanie z energii:: Elektryczny/olej napędowy
Aplikacja:: Panel/Części Powłoka: 10-50um
Poziom hałasu: ≤50dB Tworzywo: Stal

Coattech 3M Heavy-Duty Water Curtain Spray Booth – Built for Global Industrial Standards

At Coattech, we understand that professional surface treatment requires professional equipment. We are excited to announce the official global release of our new 3-Meter Industrial Water Curtain Spray Booth, designed specifically to meet the rigorous demands of overseas manufacturing facilities, auto repair shops, and heavy-industry coating lines.

Unlike lightweight, e-commerce grade alternatives flooding the market, the Coattech 3M Spray Booth is engineered for longevity, safety, and ultimate performance. We have eliminated the common pain points of cheap booths—such as severe vibration, rapid rusting, and electrical hazards—by utilizing authentic materials and export-grade components.

Why Choose the Coattech Industrial Series?

Technical Specifications

Parameter Specification (Option 1: Standard Industrial) Specification (Option 2: Maximum Anti-Corrosion)
Model Name Coattech 3M-WCSB-201 Coattech 3M-WCSB-304
External Dimensions L 3000mm x W 1150mm x H 2000mm L 3000mm x W 1150mm x H 2000mm
Main Body Material Authentic SUS 201 Stainless Steel Authentic SUS 304 Stainless Steel
Material Thickness 1.2mm - 1.5mm 1.2mm - 1.5mm
Exhaust Fan System 2 x 3KW / 380V (Top-mounted, Industrial) 2 x 3KW / 380V (Top-mounted, Industrial)
Water Circulation System 1 x High-flow Industrial Water Pump 1 x High-flow Industrial Water Pump
Filtration Method High-efficiency Water Curtain High-efficiency Water Curtain
Electrical Control Standard Control Box with Safety Relays Standard Control Box with Safety Relays
Lighting System 1 x Explosion-proof LED 1 x Explosion-proof LED
Included Accessories 2 x Elbows, 2 x Air Ducts, 8 x Flanges 2 x Elbows, 2 x Air Ducts, 8 x Flanges
Standard Packaging Export-Grade Plywood Crate Export-Grade Plywood Crate

Expert Advice & Maintenance Tips

Coattech Tip: To ensure the long-term stability of the spray booth, we recommend replacing the floor fiberglass filter every 100 working hours. Additionally, keeping the area within 10 meters of the air intake free of heavy dust accumulation can extend the lifespan of the ceiling filter by 20%.

In the industrial coating sector, we provide more than just equipment; we deliver one-stop technical support. Our engineering team has over 10 years of experience delivering overseas projects, ensuring every spray booth complies with local voltage, frequency, and safety standards.

Coattech 3M Heavy-Duty Water Curtain Spray Booth Built for Global Industrial Standards 0

Coattech 3M Heavy-Duty Water Curtain Spray Booth Built for Global Industrial Standards 1

 

Szczegóły kontaktu
Tim

Numer telefonu : +86 189 8118 9424

Co to jest? : +8618981189424